Microflame soldering unit — MIG-O-MAT Lötstar 141

Out of service. The automatic leak test failed on 10 October 2026 because of a small crack at the edge of the vaporizer glass. Replacement parts were ordered on 12 October. Do not use the machine until it is repaired and cleared.

Microflame soldering unit that makes its own hydrogen/oxygen gas by electrolysis of water. Used for precision soldering and brazing of small parts and jewellery. No gas bottles needed.

MIG-O-MAT Lötstar 141, front view

MIG-O-MAT Lötstar 141, front view




Location

Silver smithing workshop, soldering corner

Access

Introduction course required

Working pressure

50–150 mbar recommended; 300 mbar is the safety maximum

Max. nozzle

1.0 mm

Power

230 V, 900 W

Help

Slack #silversmide

Introduced in spring 2024 after the propane equipment was removed in autumn 2023. Propane cylinders may not be stored in the silver smithing workshop.

Materials

  • Solder and flux suitable for the metal. No tin or lead in the workshop.

  • Solder on charcoal, ceramic or Skamol blocks.

Safety

The gas is highly flammable. The electrolyte is strongly corrosive, and BLQ-1800 is flammable.

  • Never leave the machine running unattended, and never let gas flow from the torch without a flame.

  • Never slowly turn the flame down towards the nozzle. Too little gas flow causes flashback.

  • Don't use the machine if a hose, glass vessel, seal or flashback arrestor is damaged or leaking. Never bypass safety devices.

  • Stop gas production and release pressure before opening any filling port or vessel. Discharge static first by touching the metal cap nuts.

  • Wear goggles and chemical-resistant gloves when handling liquids. Don't overtighten glass-vessel fittings, because the glass cracks.

How to use

Start

  1. Check there is no out-of-service notice and that the bench is clear of combustibles.

  2. Check the reactor water level with the glass float. Check the hoses, handpiece and vessels. Torch valve closed.

  3. Turn on the rear mains switch, then press the front I/O button. Follow the display.

  4. Run the automatic leak test each day, with the reactor below 45 °C. It takes about 30 s. Do not continue if it fails.

  5. At operating pressure, check the vaporizer: the liquid must cover the gas distributor and stay below the red mark.

Solder

  1. Set the pressure with the arrow buttons, normally 50–150 mbar. Open the torch valve and light it as shown in the introduction.

  2. In short pauses, put out the flame and close the valve. In long pauses, also stop gas production with I/O.

Shut down

  1. Put out the flame quickly, with an air pulse, a dip in water or by closing the valve fast. Then close the torch valve.

  2. Stop gas production with the front I/O button.

  3. Wait for the cooling fan to stop, then turn off the rear mains switch.

  4. Clean the soldering area and leave hot work where nobody will touch it.

Troubleshooting

Symptom

Action

Leak test fails / suspected leak

Stop; do not use until fixed

Weak or unstable flame

Check nozzle, liquid levels and leak test; don't raise pressure to compensate

Flashback or damaged nozzle

Stop; have the handpiece, nozzle and flashback arrestor checked

Overtemperature / overload

Close the torch valve, press I/O for standby, leave mains on so the fan can cool it

Pressure fault or above 300 mbar

Switch off immediately and report

Chemical spill

Stop, keep ignition sources away, follow the safety data sheet

Report faults in #silversmide. Do not keep resetting a fault without fixing its cause.

Maintenance

Only do tasks covered in the introduction.

  • Reactor: check the level daily. Top up with distilled or demineralised water only, never tap water.

  • Vaporizer: check the level at operating pressure and refill with the machine stopped, never above the red mark. Clean it about once a month.

  • Drying/filter vessel: drain the condensate when it is more than 1 cm deep. Replace the filter about once a year.

  • Maintenance and repairs log

Consumables

Item

Use

Distilled / demineralised water

Reactor top-up

MIG-O-MAT electrolyte, 1 l (MG30810)

Reactor fill; not needed for routine top-ups

MIG-O-MAT BLQ-1800

Vaporizer liquid

Nozzles, filters, seals

Wear parts

Spent liquids are chemical waste.

Specifications



Supply

230 V AC, 50/60 Hz, 900 W

Gas production

Up to 140 l/h

Pressure

Adjustable 50–200 mbar, max. 300 mbar

Max. nozzle

1.0 mm

Weight

25 kg

Documents and links

Gallery

Soldering corner

Soldering corner


Soldering corner with soldering blocks, rotating supports and the torch holder.

Nameplate side

Nameplate side

Side view

Side view

Front with handpiece and hose

Front with handpiece and hose