Painting epoxy floors

Version från den 3 juni 2023 kl. 09.02 av Daniel (diskussion | bidrag) (Skapade sidan med 'Several of our floors are painted with epoxy. In general use a layer of primer and then two layers of paint The time between each layer is minimum 12 hours but maximum four...')
(skillnad) ← Äldre version | Nuvarande version (skillnad) | Nyare version → (skillnad)

Several of our floors are painted with epoxy.

In general use a layer of primer and then two layers of paint

The time between each layer is minimum 12 hours but maximum four days.