Premises & shared facilities

Layout reference: The floorplan below is dated 2025. Renovations and room changes may make older plans and photos inaccurate. Use the linked room and equipment pages for more detailed documentation; earlier layouts are collected at the end of this page.

In this page you'll find information on the floorplan and how to navigate Stockholm Makerspace.

Floorplan as of 2025

Floorplan as of 2025


General

We share the building with AWL, A Working Lab, a co-working space run by Akademiska Hus which operates across several campuses and provides co-working spaces to universities in Sweden. Other than sharing the building we are not associated with them.

Makerspace members do not have access to AWL’s kitchen. See AWL kitchen access for the restriction in Swedish and English. Members can use the Makerspace’s own kitchenette.

There are two alarms you may hear in the building, though only the fire alarm applies to Stockholm Makerspace and its members. Visit Building alarms, including the section about AWL’s alarm, for more information.

So we can continue to enjoy Stockholm Makerspace, we must all contribute to keeping it organized and clean - See the page Chores and Routines (svenska) to learn how to contribute.

Infrastructure provided and drawings are available further down in their respective sections.

Accessibility accommodations

The electronics workshop and textiles workshop are on the ground floor. Since the rooms have a raised step, there is a fixed ramp to use so you can come in.

The other workshops are in the cellar. There is an elevator available, however it is not accessible from the ground floor. To access the elevator to the cellar, contact a member of the board so a solution for access can be provided.

Corridor

Member box storage, see Member Storage (svenska)

360-degree view of corridor

Big Room

CAD workstations

CAD computers

360-degree view of CAD workstations

Laser Cutter

Lasers — equipment and documentation

360-degree view of the Laser Cutter Section

Sandblasting Room

Blast cabinet — SBC 420 - available for messy and dust-generating work like sanding away paint.

More information at Sandblasting — equipment and documentation

Electronics Room

Electronics — equipment and documentation

Chemical Storage

Storage of chemicals and volatile compounds. See Chemicals and the chemical cabinet contents.

Metal Workshop

Metal — equipment and documentation

360-degree view of the Metal Workshop

Jewelry Corner

(Previously called the Silver-Smithing Corner)

Silver smithing — equipment and documentation

360-degree view of the Jewelry Corner

Welding Room

Welding — equipment and documentation

360-degree view of the Welding Room

Textiles Room

Fabric, yarn, and other material found in the boxes on the shelf against the wall are free for all members to use.

Textile — equipment and documentation

360-degree view of the Textile Room

Wood Workshop

Wood — equipment and documentation

360-degree view of the Wood Workshop

Paint room

Painting — equipment and documentation

Storage Room (previously Workshop room)

Available materials (svenska)

Infrastructure

IT infrastructure

Compressed air system

The air ventilation system stops automatically at 20:00. There is a button to manually run the ventilation system for one hour which is in the wood workshop on the middle support column.

Fluorescent lighting

It can be useful to know about the different types of fluorescent lighting we use in different areas.

All are 120 cm in length

  • Safety Room (skyddsrummet)

    • T5 54 4000K

    • T5 28w 4000K

  • Textiles room

    • T8 36w warm white (varm vit)

  • Electronics room

    • most likely T5 28w 3000K

Reference drawings

These drawings are reference material; their dates are not recorded here.



Historical layouts

Stockholm Makerspace has been renovated several times since we moved to the new location in 2015. The plans below document earlier layouts, rather than confirming the present arrangement.

Layout - end of 2025

Layout - end of 2025

Layout - start of 2025

Layout - start of 2025

Layout (Plan 0 only) - 2015 to 2021

Layout (Plan 0 only) - 2015 to 2021